Sunday, October 26, 2008
Workshop Complete
Tuesday, October 21, 2008
Update on Construction
It's been almost a month since I updated the blog due to a combination of (1) my laptop being in the shop for over a week; (2) being out of town for over a week; and (3) being so tired at the end of a day of construction that I can hardly wiggle.
Here's where we are:
1. Completed foundations for house, deck, and workshop;
2. Completed driveways;
3. Built 24' x 30' metal building for workshop;
4. Built small bedroom and potty room inside workshop;
5. Completed plumbing and wiring for workshop;
6. Connected washer & dryer, as well as full-sized refrigerator, inside workshop; and, FINALLY
7. Moved RV from RV park to property!
It is wonderful to be living on this beautiful piece of property, even though we are still in the RV; I can only imagine how wonderful it will be once we get into the house. . .
Here's where we are:
1. Completed foundations for house, deck, and workshop;
2. Completed driveways;
3. Built 24' x 30' metal building for workshop;
4. Built small bedroom and potty room inside workshop;
5. Completed plumbing and wiring for workshop;
6. Connected washer & dryer, as well as full-sized refrigerator, inside workshop; and, FINALLY
7. Moved RV from RV park to property!
It is wonderful to be living on this beautiful piece of property, even though we are still in the RV; I can only imagine how wonderful it will be once we get into the house. . .
Subscribe to:
Posts (Atom)