Wednesday, February 11, 2009

Invisible Progress

A lot has been done on the house that doesn't show up in picitures:

1. Plumbing topout is complete;
2. Kitchen and bathroom fixtures are ordered;
3. Kitchen and bathroom faucets are purchased;
4. Touch-up paint (nail heads and seams) is completed on siding;
5. HVAC roughin is complete;
6. Ceilings and cedar trim on deck and front porch is complete;
7. Attic stairs are installed;
8. Cabinets are ordered;
9. Propane plumbing for tankless water heater and cooktop is complete;
10. Tile for kitchen countertop is bought;
11. Central vacuum system is ordered.

We believe we'll be able to move in by the end of March -- not a minute too soon!