Monday, August 18, 2008

Now That's A Foundation!

Well, the last update on the foundation left you with us awaiting the steel to be installed. While we were away at Bloys Camp Meeting, they installed the rebar and when we returned they poured the slab. Linda took pictures of the operation, which was amazing.
Click on the slide show below and you'll see that 126 cubic yards of concrete make for a pretty tall foundation. The last picture in the slide show is of Linda and Carl at our front door (or where it will be).

No comments: